...

Browse Air Conditioning Suits

PRIVATE LABEL & BULK SOURCING

Fan-Cooled Work Vest

Model 129 uses two rear fans to move air through the vest. The pictured inline controller has High, Middle and Low settings.

  • Two rear fan positions for airflow through the garment
  • Stand collar, flap pockets and an elastic hem
  • 12V DC fan and power configuration

Choose the requirements to discuss. Component options and proposed changes are reviewed for Model 129.

Black Model 129 fan cooling vest front and rear with dual fans, three-speed controller, inner power pocket and reflective tabs
Select the poster to enlarge.

Black Model 129 feature illustration. The configuration detailed on this page uses 12V DC.

START WITH THIS MODEL

Base Model & Specifications

Review the Model 129 garment and component details. Share your preferred colours, size mix and kit requirements when requesting a sample or quote.

See the Base Model

Base Specifications

The table describes the photographed Model 129 garment. Your quotation confirms the exact fan, controller and power components supplied.

Review areaFor Model 129
GarmentSleeveless vest with a stand collar, front zip, flap pockets and an elastic hem
Cooling methodTwo rear fans move air through the garment
Pictured controllerInline controller labelled High, Middle and Low
Shell & lining100% polyester / 100% polyester, according to the supplier product sheet
Pictured coloursBlack, navy and army green
Supplier size rangeM, L, XL, 2XL, 3XL and 4XL. See the garment measurements.
Power connection12V DC, with matching 12V fans
Runtime referenceApproximately 6–8 hours with the 12V fan configuration and a 12V, 20,000mAh power bank. This is a reference for that configuration. Actual runtime varies with the operating setting and use conditions.
Packed garment weightApproximately 400 g per individually packed vest, excluding fans and the power bank
Garment careMachine or hand wash after removing the fans and power bank

How the Fan-Cooled Vest Moves Air

Model 129 rear fan positions and installation by unscrewing the cover and fitting the fan from outside
Rear fan installation illustration. Confirm the correct fan mounting on the approved sample. Select the image to enlarge.

Two fans at the lower back move air into the garment. Air moves through the space between the vest and the wearer and leaves through the garment openings. The pictured inline controller is labelled High, Middle and Low.

Before ordering, review the intended clothing layers, garment fit and the matched fan, controller and power configuration on a sample.

Model 129 — same-model product video to be supplied

Model 129 — cold source rotation is inapplicable to this fan-cooled model

What Will Your Quote Include?

Tell us whether you need the garment alone or a coordinated fan and power kit. Your quotation should identify each component, its quantity and whether it is included, optional or supplied separately.

ComponentReference or enquiry itemConfirm in your quote
GarmentModel 129 vest with stand collar, front zip and flap pocketsColour, size mix, branding and quantity
Rear fansTwo rear fan positions shown on the vest, with a 12V fan configurationFan model, quantity, mounting size and connectors
Controller & cablesPictured inline controller labelled High, Middle and LowCompatible controller, cables, connectors and supplied quantities
Power & spares12V, 20,000mAh power bank for the stated runtime reference. Confirm the power bank, charging accessories and spare parts included in your quotation.Battery specification, charging requirements and items supplied separately

Compare the itemised quote against the approved sample and packing list. Request written confirmation of any change to the fans, controller, cables or power supply.

Match Fans, Connectors and Power as a System

Model 129 rear waist fan close-up with intake airflow illustrated
Air intake illustration at a rear waist fan. Confirm mounting and electrical specifications for your kit.

Review the fans, mounting dimensions, connectors, cables, battery and controller as a matched system. Record the agreed configuration during sampling for order inspection and future replacement-part enquiries.

Tell us what you want to evaluate

  • Garment-only sourcing or a kit with matching fans
  • Airflow, noise, weight and operating requirements
  • A specified fan, mounting size, connector or control requirement
  • Replacement fans, cables and future replenishment
Configuration decisionProcurement review
Base configurationTwo rear fan positions are visible on the Model 129 garment. Confirm the fan housing and mounting dimensions for your kit.
Matching optionsAsk which fan, controller, cable and power combinations are available for this garment.
Changes requiring reviewDifferent fan dimensions, quantity or position may affect garment openings, wiring and weight. Review the controller and power supply together.
Sample & quotationAgree the garment, supplied components, fit and operating checks, sample costs, MOQ and timing in the quotation.

Model 129 — water-cooling components are inapplicable

Model 129 — water-cooling components are inapplicable

Model 129 — water-cooling components are inapplicable

Match the Power & Controls

Model 129 use guide showing fan checks, matched power connection, battery stowage and inline speed control
Model 129 use illustration. Check the fan fitting, connect the matched power source, stow the battery and operate the inline control.

The Model 129 configuration uses 12V fans and a 12V DC connection. The photographed inline controller is labelled High, Middle and Low.

  • 12V fans with a matching 12V DC power connection
  • 12V, 20,000mAh power bank for the stated runtime reference
  • Confirm DC plug dimensions, polarity and charging requirements
  • Confirm the controller setting and use conditions for your runtime requirement

Runtime reference Approximately 6–8 hours with the 12V fan configuration and a 12V, 20,000mAh power bank. This is a reference for that configuration. Actual runtime varies with the operating setting and use conditions.

Confirm Fabric, Trims and Fit Together

Review the shell, lining, zips, pockets, binding and fan mounting against the photographed garment. Use material specifications and a wearing sample to assess fit and component placement together.

Close-up of the black Model 129 outer fabric
Outer fabric detail of the Model 129 sample.
Light-coloured inner lining of the Model 129 sample
Light-coloured inner lining on the Model 129 sample.
Material & roleSelection & change review
Supplier material informationThe supplier product sheet lists both shell and lining as 100% polyester. Confirm the specification for your order.
Outer fabric / shellSpecify composition, structure, weight, colour and any required performance. Review changes against the garment pattern and fan support.
Lining / interiorReview the lining, inside battery pocket, cable access and the fit of the selected components.
Buyer-specified materialProvide a swatch or specification. Agree a trial sample, sewing and fixing checks, test needs, price, MOQ and timing.

Agree any material substitution by specification and approved swatch. Review the change on the final garment with the selected fans and power kit.

Trims & Construction Details

Centre-front zipper on the black Model 129 sample
Centre-front zipper

Stand collar & front fastening

The garment has a stand collar and a centre-front zip. Check zip operation, collar shape and seam finish on the sample before approving changes.

Model 129 back reflective tabs under external light, illustrated from the sample
Reflective-tab illustration under external light. Confirm required reflective performance on the approved sample.

Back & Pocket Trim

Trim accents are shown on the back and lower pocket flaps. Agree their material, width and position, and request matching evidence for any required reflective performance.

Front flap pocket on the black Model 129 sample
Front flap pocket

Flap pockets

The photographed garment has flap pockets. Review pocket access, fastening and usable dimensions on the sample if your project needs a particular storage arrangement.

Inside battery pocket of the Model 129 vest
Inside battery pocket

Inside battery pocket

The inside pocket provides a place for the power pack. Confirm the pocket dimensions, battery fit, fixing and cable routing for the selected kit.

Elastic hem on the Model 129 sample
Elastic hem

Elastic hem & component fixing

An elastic hem is visible on the sample. Review the fit, fan mounting and cable access with the selected components installed.

Confirm trims, stitching and component fixing in the approved sample and inspection checklist.

For a proposed trim change, agree the specification, material compatibility, sample acceptance, price, MOQ and timing. Coordinate labels and packaging in the branding review.

Sizing & Wearing Guidance

Model 129 Garment Size Reference

Use the supplier measurements to shortlist sizes for a sample.

Measurement (cm)MLXL2XL3XL4XL
Garment length656769717375
Chest circumference116120124128132136
Shoulder width434446474950

Supplier garment measurements in centimetres. The supplier notes a possible 1–3 cm difference depending on the measuring method and placement. Confirm measurements, grading and tolerances against the approved sample.

Fit & Order Sizing

Compare the garment measurements with the wearer and intended clothing layers. Check movement, the inside battery pocket and the selected fan kit on the sample before confirming the order size mix.

Portrait front view of the black Model 129 vest with illustrated airflow at the armhole
Black Model 129 front view with airflow illustrated. Confirm fit and component placement on the approved sample.

Testing & Verification

What a test record should confirm

Check the exact Model 129 garment, fans, battery, controller, setting and test conditions. Review airflow, noise, battery runtime and any required garment performance against the proposed configuration.

MATCH EVIDENCE TO THE CONFIGURATION

Ask for the conditions behind the result.

Request records that identify the Model 129 garment, fans, battery and controller used. Agree which airflow, noise, runtime and garment checks are needed for your project.

Review any performance result together with its measurement method, operating setting, environment and exact component list.

A useful test record identifies

  • Model 129 garment and complete component configuration
  • Fan models, battery and controller setting
  • Ambient conditions and measurement positions
  • Test method, time interval and stopping criterion
  • Recorded results and supporting photographs

Model 129 — same-model assembly footage to be supplied

OEM, Private Label & Sample Approval

Agree Branding and Packaging on the Sample

Share your logo artwork and preferred position, plus requirements for labels, hangtags, instructions or packaging. EVERLANDA coordinates sample review against the garment, components and quotation scope.

Chest pocket and trim on the black Model 129 sample for branding placement review
Chest detail for branding placement review. Agree the artwork, method and position on the sample.

What to Prepare for Sample Review

  • Logo artwork, location and finished dimensions
  • Labels, packaging and instructions required for your market
  • Preferred colours, size mix, fan kit and approximate order quantity

Review the branding method and location for the selected fabric and garment construction. Agree the process, sample appearance and acceptance criteria before placing the bulk order.

DecisionWhat to establish
Base garmentUse the Model 129 garment and its collar, zip, pockets and fan positions to agree the branding area.
Options & proposed changesAsk which branding, label and packaging formats are available. Review changes to materials, markings or construction on a sample.
Quote & sample approvalAgree artwork, placement, process, sample costs, MOQ, timing and bulk-order conditions in writing.

Production, Quality & Packing

See the garment workshop references and agree what to check before shipment. For Model 129, EVERLANDA coordinates the approved sample, component list and production requirements with the selected supplier.

Garment Production Scenes

Six views of general garment production, from fabric preparation to garment handling and the overall workflow.

Rows of wrapped fabric rolls stored in a garment workshop
Fabric storage
A worker guiding a cutting machine through stacked fabric
Fabric cutting
Workers guiding fabric through a spreading machine
Fabric spreading
A worker operating garment pressing equipment beside hanging clothing
Garment pressing
Workers handling a garment at a workshop station
Garment workstations
Workflow illustration over a garment display, from requirements and sampling to production, inspection and dispatch
Garment production workflow

What to Check on Model 129

Use the approved sample and agreed specifications as the reference for your order.

Installed fan on the black Model 129 sample
Model 129 fitted fan

Confirm Before Shipment

  • Check garment measurements and the supplied parts list.
  • Check fan mounting, controller, cable and power connections.
  • Agree fan settings and operating checks for the selected kit.

Workshop & Equipment

A look at general garment workshop facilities and equipment.

Garment production floor
Garment production floor
Garment handling station
Garment handling station
Garment folding station
Garment folding station
Garment staging area
Garment staging area
Carton staging aisle
Carton staging aisle
Sewing workstation
Sewing workstation

Confirm How the Order Will Be Packed

Use the itemized quotation and packing list to agree the packing details for your configuration.

Garment-only packing reference: approximately 400 g per individually packed vest, excluding fans and the power bank. Outer carton: approximately 57 × 38 × 56 cm, containing approximately 60 vests.

Archived packing and dispatch examples from general garment orders.

Cartons staged for dispatch
Cartons staged for dispatch
Garment folding before packing
Garment folding before packing
Garment facility overview
Garment facility overview
Cartons loaded into a container
Cartons loaded into a container
Carton handling during loading
Carton handling during loading
Shipping container at dispatch
Shipping container at dispatch

Items to Confirm

  • Garment and accessory counts
  • Labels and instructions
  • Carton quantities and markings
Review what your quote can include

Archived Certificate & Audit References

These documents apply to the suppliers, facilities or materials listed on them. Ask us which current documents apply to your cooling vest configuration and destination market.

Archived OEKO-TEX STANDARD 100 certificate issued to the SBS zipper supplier
SBS zipper supplier · OEKO-TEX STANDARD 100 · expired October 2024
Archived SMETA factory audit report from August 2023
SMETA factory audit report · August 2023 · archived copy
Archived amfori BSCI facility audit extract
amfori BSCI facility audit extract · expired July 2024
Archived Global Recycled Standard facility scope appendix
Global Recycled Standard facility scope appendix · archived copy

From Sample Approval to Order Inspection

Agree a written sample approval and inspection plan with our procurement coordination team. Confirm the scope, any third-party involvement and fees for your order.

01 / Approve

Approve the Model 129 garment, colours, sizes and agreed component list.

02 / Coordinate

Record production requirements and confirm any changes to the approved sample.

03 / Inspect

Check garment measurements, fan mounts, controller, cables and power connections.

04 / Pack

Check agreed components, garment labels, packaging and the packing list.

Inspection scopeItems to agree
GarmentReview measurements, colours, fabric, pockets, trim and construction against the approved sample.
Fan & power kitCheck the fan, controller, cable and battery models against the component list. Review mounting, connections and operation as agreed.
Complete orderCheck the size and colour mix, component quantities, labels and packaging against the quotation and packing list.

Cleaning, Maintenance & Spare Parts

GARMENT-BODY CARE

Remove the fans and power bank first.

The garment can be machine washed or hand washed. Remove the fans and power bank before washing.

Washing, drying & storage

Machine washing and hand washing are supported for the garment after removing the fans and power bank. Confirm the washing temperature, cycle, drying and storage instructions for your order.

Plan replacement support

Discuss replacement fans, controller, cables and power accessories for the agreed kit. Confirm compatible part references, availability and service terms with the quotation.

Frequently Asked Questions

How does the Model 129 fan-cooled vest work?

Two rear fans move air through the garment. The photographed inline controller is labelled High, Middle and Low. Confirm the exact fan and power kit supplied with your quotation.

What is included with the vest?

Ask for an itemised quote covering the garment, fans, controller, cables and any power or charging accessories. Confirm which items are included, optional or supplied separately, with their quantities.

How long will the battery run?

Approximately 6–8 hours with the 12V fan configuration and a 12V, 20,000mAh power bank. This is a reference for that configuration. Actual runtime varies with the operating setting and use conditions.

Which colours and sizes are shown?

The supplied materials show black, navy and army green. The supplier size chart lists M through 4XL. See the garment measurements and confirm the available colour and size mix for your order.

Can I specify a different fan or power kit?

Share the fan, controller, battery or operating requirements you want to evaluate. Review mounting dimensions, cables, connectors, charging requirements and compatibility together during sampling.

What are the sizing and packing references?

Compare the M–4XL garment measurements with the wearer and intended clothing layers. Garment-only packing reference: approximately 400 g per individually packed vest, excluding fans and the power bank. Outer carton: approximately 57 × 38 × 56 cm, containing approximately 60 vests.

Can I add my branding and arrange a sample?

Share your artwork, preferred placement, labels and packaging requirements. Agree the branding method, sample scope, fees, timing and minimum order quantity for Model 129.

How should I clean the garment and order spares?

The garment can be machine washed or hand washed. Remove the fans and power bank before washing. For replacements, confirm the fan, controller, cable and power-accessory references that match your kit.

Request a Quote or Discuss a Sample

Share your intended use, preferred colours, size mix, approximate quantity and any branding or component requirements. Tell us whether you are evaluating a sample or planning a bulk order.

You can begin with a sample or project enquiry even if some details are still undecided.

EVERLANDA will discuss the Model 129 garment, fan and power configuration, sample requirements and quotation scope with you. Confirm the available options, costs, MOQ and timing for the agreed setup.

Purchasing topicWhat your enquiry can cover
Samples & order termsDiscuss samples, MOQ, the M–4XL garment size mix and preferred colours.
Timing & logisticsAgree sample and bulk lead times, packaging, shipping and service conditions.
Quotation scopeConfirm the garment, fans, controller, cables, power accessories and spares included in your quote.
Doya Zeng — EVERLANDA

Doya Zeng

Procurement Coordination & OEM / ODM Project Support

Your Enquiry

Share a few details to request a quote or sample.

Fan-Cooled Work Vest · Model 129

Your details are used to respond to this enquiry. Privacy Policy.

Enquire about Model 129

Share a few details to request a quote or sample.

Fan-Cooled Work Vest · Model 129

Privacy Policy · doya.zeng@everlanda.com

We will contact you within 1 working day. You can also reach us directly at doya.zeng@everlanda.com.

Seraphinite AcceleratorOptimized by Seraphinite Accelerator
Turns on site high speed to be attractive for people and search engines.