...

Browse Air Conditioning Suits

PRIVATE LABEL & BULK SOURCING

M907 Water-Activated Evaporative Cooling Vest

Prepare the M907 with water and adjust the vest over your workwear. Removable front and back cooling panels let you review fit, daily preparation and replacement needs on the same sample.

  • Water evaporation cooling
  • Removable front and back cooling panels
  • Adjustable side closures and waist straps

Choose the M907 requirements to discuss. Panel supply, available materials and proposed changes are reviewed against the selected sample.

Lime M907 cooling vest front and rear with detachable pads, silver-coloured bands and adjustable straps
Select the poster to enlarge.

Lime M907 feature illustration. Confirm any required reflective performance on the approved sample.

START WITH M907

M907 at a Glance

Review the photographed M907, including its side closures, waist straps and removable panels. Share your preferred color, intended clothing layers and order requirements when requesting a sample.

See the M907 from Every Side

M907 Base Specifications

This overview describes the photographed M907 and supplier reference information. Confirm the final materials, measurements, panel set and packing details in your quotation.

Review areaM907 reference
Cooling methodWater retained in the cooling panels provides evaporative cooling. Preparation instructions are confirmed for the supplied sample.
Panel arrangementTwo removable cooling panels, one at the front and one at the back. Confirm the complete supply set.
ConstructionRound neckline, adjustable side hook-and-loop closures, waist straps and chest pen holder.
Pictured colorsGreen, navy and orange. Confirm the available color and size mix for your order.
Panel specificationReview the front and back panel dimensions, measurement directions and attachment on the sample.
Garment size & weightRequest the confirmed garment measurements, adjustment range and dry/ready-to-use weights for your configuration.

Cooling Prepared with Water

M907 use guide showing pad removal, water activation, refitting and wearing adjustment
M907 use illustration. Remove the pads, activate them with water as instructed, refit them and adjust the vest. Select the image to enlarge.

The M907 uses water retained in its cooling panels for evaporative cooling. The front and back panels attach with hook-and-loop fasteners and can be removed. Obtain the preparation instructions for the exact sample configuration you plan to evaluate.

Sample review should cover preparation, water quantity, clothing layers, airflow and humidity in the intended working conditions. Confirm replenishment, drying and storage instructions before order approval.

M907 — M907 product video to be supplied

M907 — frozen-pack rotation does not apply to M907

Confirm Your Vest and Panel Set

Ask for an itemized quotation covering the M907 vest, front panel, back panel, any replacement panels, instructions and packaging. Record each item and quantity against the approved sample.

ComponentReference or enquiry itemConfirm in your quote
Vest bodyM907 with adjustable side closures and waist strapsColor, confirmed size and measurements, branding and quantity
Front & back panelsTwo removable cooling panels shown in the supplier informationExact panel references, attachment and supplied quantity
Replacement panelsAdditional panels for replenishment or serviceCompatibility, quantity, availability and supply terms
Instructions & packingPreparation, use, care and packaging requirementsDocuments, labels, packing format and supplied quantities

Compare the itemized quote with the approved M907 sample and packing list. Confirm any change to the garment, panel materials, attachment or supplied quantities in writing.

M907 — fan system does not apply to M907

M907 — fan system does not apply to M907

Front and Back Cooling Panels

Review the front and back cooling panels together with the M907 vest. The panels can be removed from their hook-and-loop attachments. Include spare panel quantities in your enquiry so each item can be identified in the quote.

M907 front and back detachable cooling pads and their hook-and-loop fitting
Panel placement and removal illustration. The front and back pads attach with hook-and-loop fasteners. Select the image to enlarge.

Match the panel set to your working conditions

Review areaM907 sample review
Panel arrangementConfirm the front and back positions, attachment area and whether the two panels use the same specification.
Panel dimensionsReview the panel identity, dimensions, measurement direction and attachment on the sample.
Preparation & useObtain instructions covering water preparation, replenishment, use conditions, drying and storage.
Replacement supplySpecify the required spare quantity and agree compatible panel references and supply terms.

Approve the panels with the garment

Confirm the sample assembly, attachment security, comfort and movement over the intended clothing layers. Review any proposed panel or fabric change against the complete vest.

Agree the panel set, preparation instructions, replacement requirements, sample costs, MOQ and timing in the quotation.

M907 — battery and powered controls do not apply to M907

Materials for Sample Review

Review the outer fabric, lining, cooling-panel material, hook-and-loop attachments, straps and edge finish together. Use material specifications, swatches and the approved sample to confirm the construction for your order.

Close-up of the M907 lime-green outer fabric and silver-coloured band
M907 outer fabric and silver-colored band
Front and back interior of the M907 sample showing two detachable cooling panels
M907 front and back inner surfaces with detachable panels
Material & roleReview before approval
Outer fabricConfirm the supplier material specification, composition, weight and selected color against the sample.
Lining & interiorReview the inner surface, panel attachments and comfort with the intended clothing layers.
Cooling-panel materialRequest the exact material layers and preparation instructions. Confirm their relationship to the supplied evaporative cooling design.
Buyer-specified changesProvide a swatch or specification. Review the trial sample, attachment, care, test requirements, price and order terms.

Confirm each material by specification and approved sample. Assess any substitution with the complete M907 garment and panel arrangement.

Fit and Construction Details

M907 round neckline with bound edges
Round neckline and bound edges

Round neckline and bound edges

The sample has a round neckline and bound edges. Review the neck opening, seam finish and comfort over the clothing your team will wear. Check the adjustable side closures and waist straps during the same sample review.

M907 silver-coloured strip under incoming light, shown as an illustration
M907 silver-coloured band with reflected light illustrated. Confirm any required reflective-performance evidence.

Silver-colored bands

Silver-colored bands are visible on the garment. Confirm their material, position and any required reflective-performance evidence for your application.

M907 chest pen loop with a pen shown for placement
M907 chest and front detail

Front and chest details

Review the chest pen holder, front construction and accessible branding areas on the M907 sample. Agree usable dimensions and any requested changes before order approval.

M907 detachable cooling pad corner and hook-and-loop attachment illustrated
M907 removable cooling-panel attachment with a cooling effect illustrated. Confirm panel fit on the sample.

Removable cooling-panel attachment

Check how the front and back panels attach, detach and sit inside the vest. Agree the attachment area, panel specification and replacement requirements.

Front and back interior of the M907 sample showing two detachable cooling panels
Inner surface and attachment area

Lining and edge finish

Review the inner surface, seams, binding and reinforcement together with the panels fitted. Confirm any changes through sample approval.

Confirm trims, panel attachment and sewing requirements in the approved M907 sample and inspection checklist.

For a proposed trim or construction change, agree the specification, material compatibility, sample acceptance, price, MOQ and timing. Review labels and packaging with the branding brief.

Check Fit over Your Workwear

M907 Fit and Measurement Review

Request the confirmed garment measurements and adjustment range. Review fit over the clothing your team will wear, with both cooling panels installed.

Measurement topicWhat to confirm
Garment measurementsLength, chest and shoulder measurement points, units and tolerance
Adjustment rangeSide-closure overlap, strap range, intended clothing layers and wearer fit
Cooling-panel referenceSupplier panel reference 31 × 30 cm; confirm panel identity and measurement directions
Ready-to-use weightRecord garment and panel weights with the confirmed water preparation method

Supplier size references require sample confirmation before the order size mix is agreed.

Review fit on the sample

Tell us the wearer measurements and clothing layers. Check closure overlap, arm movement, panel placement and comfort on the prepared sample before confirming the order.

Portrait front view of lime M907 with the front cooling panel area illustrated
Lime M907 front view with cooling illustrated. Review fit over workwear on the approved sample.

Evaluate M907 in Your Working Conditions

What an M907 test record should confirm

Review the exact garment and panels, preparation, water quantity, ambient temperature, humidity, airflow, clothing layers and measurement procedure. Cooling duration and results are evaluated for that recorded configuration.

MATCH EVIDENCE TO THE CONFIGURATION

Agree the conditions behind the result

Request M907 records that identify the garment, panels, preparation method and intended use conditions. Agree the required cooling, replenishment, care and garment checks with the sample review.

Review each performance result with the sample configuration, water preparation, humidity, airflow, clothing layers and measurement method.

A useful test record identifies

  • M907 garment and exact front/back panel references
  • Preparation method, water quantity and ready-to-use weight
  • Ambient temperature, humidity, airflow and clothing layers
  • Measurement positions, method, intervals and stopping criterion
  • Recorded results and supporting photographs

M907 — M907 assembly footage to be supplied

OEM, Private Label and Sample Approval

Discuss Branding for Your M907 Order

Send your logo placement, label and packaging requirements with your target quantity. EVERLANDA coordinates sourcing review, sample confirmation and order details for your M907 project.

M907 chest pen loop with a pen shown for placement
Review the M907 chest details for branding placement

What to Prepare for Sample Review

  • Logo artwork, preferred position and finished dimensions
  • Labels, instructions and packaging for your target market
  • Color mix, wearer requirements, panel set and estimated order quantity

Review each branding method and location against the selected fabric, silver-colored bands, chest details and panel attachment. Agree the process and appearance on the sample.

DecisionWhat to establish
Base garmentUse the M907 garment, closures, bands and panels to agree the branding area.
Proposed changesReview available label, logo and packaging formats against the selected materials and sample.
Quote & approvalConfirm artwork, placement, process, sample costs, MOQ, timing and bulk-order conditions in writing.

Production, Quality & Packing

Browse general garment production, workshop, packing and archived document references. For your M907 order, agree the approved sample, vest and panel set, order specification and inspection plan with EVERLANDA.

Garment Production Scenes

Six views of general garment production, from fabric preparation to garment handling and the overall workflow.

Rows of wrapped fabric rolls stored in a garment workshop
Fabric storage
A worker guiding a cutting machine through stacked fabric
Fabric cutting
Workers guiding fabric through a spreading machine
Fabric spreading
A worker operating garment pressing equipment beside hanging clothing
Garment pressing
Garment handling station
Garment handling station
Workflow illustration over a garment display, from requirements and sampling to production, inspection and dispatch
Garment production workflow

What to Check on the M907 Cooling Vest

Use the approved sample and agreed specifications as the reference for your order.

M907 detachable cooling panel lifted from its hook-and-loop fixing
M907 removable cooling panel and attachment

Confirm Before Shipment

  • Check garment measurements and the supplied vest and cooling-panel list.
  • Check cooling-panel attachments, side closures, waist straps and seam finish.
  • Agree preparation, fit, cooling and care checks for the approved sample.

Workshop & Equipment

A look at general garment workshop facilities and equipment.

Garment production floor
Garment production floor
Garment handling station
Garment handling station
Garment folding station
Garment folding station
Garment staging area
Garment staging area
Carton staging aisle
Carton staging aisle
Garment facility overview
Garment facility overview

Confirm How the Order Will Be Packed

Use the itemized quotation and packing list to agree the packing details for your configuration.

Archived packing and dispatch examples from general garment orders.

Cartons staged for dispatch
Cartons staged for dispatch
Garment folding before packing
Garment folding before packing
Garment facility overview
Garment facility overview
Cartons loaded into a container
Cartons loaded into a container
Carton handling during loading
Carton handling during loading
Shipping container at dispatch
Shipping container at dispatch

Items to Confirm

  • Vest and cooling-panel quantities
  • Labels and instructions
  • Carton quantities and markings
Review what your quote can include

Archived Certificate & Audit References

These documents apply to the suppliers, facilities or materials listed on them. Ask which current documents apply to the selected materials, production facility and destination market for your M907 order.

Archived OEKO-TEX STANDARD 100 certificate issued to the SBS zipper supplier
SBS zipper supplier · OEKO-TEX STANDARD 100 · expired October 2024
Archived SMETA factory audit report from August 2023
SMETA factory audit report · August 2023 · archived copy
Archived amfori BSCI facility audit extract
amfori BSCI facility audit extract · expired July 2024
Archived Global Recycled Standard facility scope appendix
Global Recycled Standard facility scope appendix · archived copy

Plan Your Sample and Bulk Order

Agree a written M907 sample approval and inspection plan. Confirm the order scope, any third-party inspection and fees with the quotation.

01 / Approve

Approve the M907 garment, color, measurements, panel set and supply list.

02 / Coordinate

Record the order requirements and confirm changes to the approved sample.

03 / Inspect

Check measurements, closures, straps, panel attachment and the agreed preparation instructions.

04 / Pack

Check panel quantities, replacement items, garment labels, packaging and the packing list.

Inspection scopeItems to agree
GarmentReview measurements, colors, fabric, closures, straps, bands and sewing against the approved sample.
Panel setConfirm panel references, quantities, attachment, sample preparation and any agreed functional checks.
Complete orderCheck the size/color mix, panels and spares, instructions, labels and packing list.

Care and Replacement Panels

GARMENT AND PANEL CARE

Request the M907 preparation and care instructions

Obtain the M907 instructions for preparing, removing and cleaning the panels and garment. Confirm the handling method for each material before use.

Confirm drying and storage

Ask for the complete cleaning, drying and storage procedure for the supplied garment and cooling panels. Confirm how to prepare the vest again for the next use.

Plan replacement-panel supply

Include replacement panel needs in your enquiry. Confirm compatible references, quantities, availability and service conditions with the quotation.

Frequently Asked Questions

How does the M907 cooling vest work?

The M907 uses water retained in its cooling panels for evaporative cooling. Request the preparation instructions for the exact sample configuration you plan to evaluate.

Can the cooling panels be replaced?

The front and back panels are removable. Include replacement panel quantities in your enquiry so their specification and supply terms can be confirmed with the vest.

How do I select the right fit?

Review the confirmed garment measurements and adjustment range over the clothing your team will wear. Share your wearer and size requirements when requesting a sample.

What should I check when ordering replacement panels?

Match the front and back panel references, dimensions and attachment to the approved vest. Include the required replacement quantities with your enquiry.

How long does cooling last?

Evaluate cooling duration using the confirmed preparation method and your working conditions. Share the expected wear time, temperature, humidity, airflow and clothing layers with your sample request.

Can I add my own branding?

Send your logo artwork, placement, label and packaging requirements. Available methods, quantities, costs and sample requirements are reviewed for your M907 order.

How should I clean and store it?

Request the complete M907 instructions for preparing, removing, cleaning, drying and storing the garment and panels. Confirm the procedure for the exact materials supplied.

What is included in the quotation?

Ask for an itemized quotation identifying the vest, front and back panels, replacement panels and agreed packaging. Each item and quantity should match the approved sample and order confirmation.

Request a Quote or Discuss a Sample

Share your target market, intended use, quantities and branding brief. Add requirements for replacement panels, packaging and sample evaluation so we can review the M907 configuration for your project.

You can begin with a sample or project enquiry even if some details are still undecided.

EVERLANDA will discuss the M907 garment, panel set, sample requirements and quotation scope with you. Available options, costs, MOQ and timing are confirmed for the agreed order.

Purchasing topicYour M907 enquiry
Samples & order termsGarment measurements, colors, panel set, samples and MOQ
Timing & logisticsSample and bulk timing, labels, packaging and shipping
Quotation scopeVest, front/back panels, replacement panels, instructions and packing
Doya Zeng — EVERLANDA

Doya Zeng

Procurement Coordination & OEM / ODM Project Support

Your Enquiry

Share a few details to request a quote or sample.

M907 Water-Activated Evaporative Cooling Vest · Model M907

Your details are used to respond to this enquiry. Privacy Policy.

Enquire about M907

Share a few details to request a quote or sample.

M907 Water-Activated Evaporative Cooling Vest · Model M907

Privacy Policy · doya.zeng@everlanda.com

We will contact you within 1 working day. You can also reach us directly at doya.zeng@everlanda.com.

Seraphinite AcceleratorOptimized by Seraphinite Accelerator
Turns on site high speed to be attractive for people and search engines.